Studio Project
Southern Illinois University of Carbondale, SIU, Fall 2014
Location
|
Barra da Tijuca,
Brazil
|
Project
|
Stage I: Master-planning
of Community on the site used for Rio Olympic 2016 after the event
Stage II: Design the hotel building on the site allocated in the proposed
master- plan.
|
Description
|
AECOM won the competition for the master plan design contract for the 2016 Rio de Janeiro Olympic and the project is currently under the construction phase.Design of AECOM includes three phases: the Rio Olympic Park area during the 2016 Games, a transition plan and the final position showcasing the site in legacy mode after 2016. The Objective of our studio project is to propose the new master plan for the legacy mode for the portion to the Site in Barra da Tijuca. Designing new spaces and places while giving respect to the old and demolished is crucial for the livability and success of a project.
|
Stage I: Masterplanning
![]() |
| Location Plan |
![]() |
| Master plan by AECOM for Legacy mode |
![]() |
| Proposed Masterplan |
![]() |
| Zoning of the site |
![]() |
| Olympic way, Pedestrian way and Roadways layout |
![]() |
| Shadow Analysis for different time of the year |
![]() |
| Exploded view of the Site Plan |


















